VIIRS detected a 178MW thermal anomaly 2.1km from Yamal LNG Terminal (lng_terminal, PetroChina). Possible fire / unplanned flaring / outage. Confidence: h. Site runs hot routinely (8 of last 30 days, median 59MW) — this is ≈3.0× its normal output. Site is ≈13% of 0857.HK's tracked t of LNG/yr capacity (major materiality). Watch 0857.HK and TTF / Henry Hub gas for disruption confirmation. Confidence 79%.
VIEW LIVE ON THE DESK →
WHAT IS EARLYWIRE?