VIIRS detected a 69MW thermal anomaly 2.9km from Moralets hydroelectric plant (power_plant, Enel SpA). Possible fire / unplanned flaring / outage. Confidence: n. Site is ≈1% of ENEL.MI's tracked MW capacity (minor materiality). Watch ENEL.MI and the affected commodity for disruption confirmation. Confidence 74%.
VIEW LIVE ON THE DESK →
WHAT IS EARLYWIRE?