EARLYWIRE
· signals before the wire
low
427MW forced outage — BLENOD 5
04:08:29 UTC · confidence 75% · estimated effect ~0.4σ (~0.4%) · detected by EARLYWIRE from primary sources
427MW at BLENOD 5 — BLENOD 5. Cause: B18. Watch FR day-ahead power (EPEX/EEX). Confidence 75%.
EVIDENCE
BLENOD 5
— 427MW out
VIEW LIVE ON THE DESK →
WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire.
Live scorecard
· informational signals, not investment advice.