EARLYWIRE
· signals before the wire
low
134MW forced outage — BRENNILIS 3
04:54:08 UTC · confidence 75% · estimated effect ~1.1σ (~1.3%) · detected by EARLYWIRE from primary sources
134MW at BRENNILIS 3 — BRENNILIS 3. Cause: B18. Watch FR day-ahead power (EPEX/EEX). Confidence 75%.
VIEW LIVE ON THE DESK →
WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire.
Live scorecard
· informational signals, not investment advice.