EARLYWIRE · signals before the wire
low

134MW forced outage — BRENNILIS 3

04:54:08 UTC · confidence 75% · estimated effect ~1.1σ (~1.3%) · detected by EARLYWIRE from primary sources

134MW at BRENNILIS 3 — BRENNILIS 3. Cause: B18. Watch FR day-ahead power (EPEX/EEX). Confidence 75%.

134MW forced outage — BRENNILIS 3 — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.