EARLYWIRE · signals before the wire
low

442MW forced outage — Carrington Power Ltd

14:40:04 UTC · confidence 75% · estimated effect ~1.0σ (~1.3%) · detected by EARLYWIRE from primary sources

442MW at CARR-1 — Carrington Power Ltd. Cause: Forced Outage-Unit Unavailable. Watch GB day-ahead power (N2EX/EPEX). Confidence 75%.

442MW forced outage — Carrington Power Ltd — EARLYWIRE event card

EVIDENCE

VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.