EARLYWIRE · signals before the wire
medium

645MW forced outage — Drax Group plc (DRX.L)

09:54:15 UTC · confidence 91% · estimated effect ~0.5σ (~0.5%) · detected by EARLYWIRE from primary sources
$DRX.L

645MW at DRAXX-4 — Drax Group plc. Cause: Boiler / Fuel supply. ≈24% of DRX.L's tracked 2676MW fleet (major materiality). Watch DRX.L and GB day-ahead power (N2EX/EPEX). Confidence 91%.

645MW forced outage — Drax Group plc (DRX.L) — EARLYWIRE event card

EVIDENCE

VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.