EARLYWIRE · signals before the wire
low

326MW forced outage — EP NI Energy Limited

12:20:10 UTC · confidence 75% · estimated effect ~1.0σ (~1.3%) · detected by EARLYWIRE from primary sources

326MW at GU_504120 (GT7) — EP NI Energy Limited. Cause: Generator Issues. Watch IE day-ahead power (EPEX/EEX). Confidence 75%.

326MW forced outage — EP NI Energy Limited — EARLYWIRE event card

EVIDENCE

VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.