EARLYWIRE · signals before the wire
medium

790MW forced outage — EnBW Energie Baden-Württemberg (EBK.DE)

14:18:35 UTC · confidence 91% · estimated effect ~1.0σ (~1.3%) · detected by EARLYWIRE from primary sources
$EBK.DE

790MW at Rheinhafen-Dampfkraftwerk Karlsruhe — EnBW Energie Baden-Württemberg. Cause: B18. ≈3% of EBK.DE's 24000MW fleet (moderate materiality). Watch EBK.DE and DE-LU day-ahead power (EPEX/EEX). Confidence 91%.

790MW forced outage — EnBW Energie Baden-Württemberg (EBK.DE) — EARLYWIRE event card

EVIDENCE

VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.