EARLYWIRE · signals before the wire
low

299MW forced outage — Hirwaun Power Limited

11:18:17 UTC · confidence 75% · estimated effect ~0.4σ (~0.4%) · detected by EARLYWIRE from primary sources

299MW at HIRWN-1 — Hirwaun Power Limited. Cause: Planned Outage/Restriction. Watch GB day-ahead power (N2EX/EPEX). Confidence 75%.

299MW forced outage — Hirwaun Power Limited — EARLYWIRE event card

EVIDENCE

VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.