EARLYWIRE
· signals before the wire
low
145MW forced outage — KW Kühtai
09:08:40 UTC · confidence 75% · estimated effect ~0.6σ (~0.5%) · detected by EARLYWIRE from primary sources
145MW at KW Kühtai — KW Kühtai. Cause: B18. Watch DE-LU day-ahead power (EPEX/EEX). Confidence 75%.
EVIDENCE
KW Kühtai
— 145MW out
VIEW LIVE ON THE DESK →
WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire.
Live scorecard
· informational signals, not investment advice.