EARLYWIRE
· signals before the wire
low
250MW forced outage — KW Silz
04:38:58 UTC · confidence 75% · estimated effect ~1.0σ (~1.3%) · detected by EARLYWIRE from primary sources
250MW at KW Silz — KW Silz. Cause: B18. Watch DE-LU day-ahead power (EPEX/EEX). Confidence 75%.
EVIDENCE
KW Silz
— 250MW out
VIEW LIVE ON THE DESK →
WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire.
Live scorecard
· informational signals, not investment advice.