EARLYWIRE · signals before the wire
low

180MW forced outage — Marchwood Power Limited

11:27:04 UTC · confidence 75% · estimated effect ~0.4σ (~0.4%) · detected by EARLYWIRE from primary sources

180MW at T_MRWD-1 — Marchwood Power Limited. Cause: CONSTRAINT DUE TO COOLING WATER TEMPERATURE. Watch GB day-ahead power (N2EX/EPEX). Confidence 75%.

180MW forced outage — Marchwood Power Limited — EARLYWIRE event card

EVIDENCE

VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.