EARLYWIRE · signals before the wire
low
200MW forced outage — Mutkalampi Tuulipuisto Oy
16:08:20 UTC · confidence 75% · estimated effect ~0.4σ (~0.4%) · detected by EARLYWIRE from primary sources
200MW at Mutkalampi South — Mutkalampi Tuulipuisto Oy. Cause: Unplanned unavailability on turbine side. Watch FI day-ahead power (Nord Pool). Confidence 75%.
EVIDENCE
- Mutkalampi South — 200MW out
VIEW LIVE ON THE DESK →
WHAT IS EARLYWIRE?