EARLYWIRE · signals before the wire
medium

394MW forced outage — RWE AG (RWE.DE)

15:33:11 UTC · confidence 91% · estimated effect ~1.0σ (~1.3%) · detected by EARLYWIRE from primary sources
$RWE.DE

394MW at STAY-1 — RWE AG. Cause: Turbine / Generator. ≈1% of RWE.DE's 44000MW fleet (minor materiality). Watch RWE.DE and GB day-ahead power (N2EX/EPEX). Confidence 91%.

394MW forced outage — RWE AG (RWE.DE) — EARLYWIRE event card

EVIDENCE

VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.