EARLYWIRE · signals before the wire
low

120MW forced outage — River Nene Power Limited

06:38:56 UTC · detected by EARLYWIRE from primary sources

120MW at PETEM1 — River Nene Power Limited. Cause: GT1 repairs. Watch GB day-ahead power (N2EX/EPEX). Confidence — occurred 92%, intensity 85%, hits ticker 30%.

120MW forced outage — River Nene Power Limited — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.