EARLYWIRE · signals before the wire
low
125MW forced outage — Statkraft AS
09:22:37 UTC · confidence 75% · estimated effect ~0.4σ (~0.4%) · detected by EARLYWIRE from primary sources
125MW at Leirdøla — Statkraft AS. Cause: Grounding fault resolved.
The generator can only start/stop once a week.. Watch NO5 day-ahead power (Nord Pool). Confidence 75%.
EVIDENCE
VIEW LIVE ON THE DESK →
WHAT IS EARLYWIRE?