EARLYWIRE · signals before the wire
low

125MW forced outage — Statkraft AS

09:22:37 UTC · confidence 75% · estimated effect ~0.4σ (~0.4%) · detected by EARLYWIRE from primary sources

125MW at Leirdøla — Statkraft AS. Cause: Grounding fault resolved. The generator can only start/stop once a week.. Watch NO5 day-ahead power (Nord Pool). Confidence 75%.

125MW forced outage — Statkraft AS — EARLYWIRE event card

EVIDENCE

VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.