EARLYWIRE · signals before the wire
low

528MW unplanned outage — RWE AG (RWE.DE)

15:23:47 UTC · detected by EARLYWIRE from primary sources
$RWE.DE

528MW unplanned outage at LBAR-1 — RWE AG. Cause: Turbine / Generator. ≈2% of RWE.DE's tracked 27761MW fleet (minor materiality). Watch RWE.DE and GB day-ahead power (N2EX/EPEX). Confidence — occurred 92%, intensity 85%, hits ticker 95%.

528MW unplanned outage — RWE AG (RWE.DE) — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.