EARLYWIRE · signals before the wire
low

120MW unplanned outage — Drax Group plc (DRX.L)

11:26:11 UTC · detected by EARLYWIRE from primary sources
$DRX.L

120MW unplanned outage at CRUA-2 — Drax Group plc. Cause: Planned Outage/Restriction. ≈4% of DRX.L's tracked 2676MW fleet (moderate materiality). Watch DRX.L and GB day-ahead power (N2EX/EPEX). Confidence — occurred 92%, intensity 85%, hits ticker 95%.

120MW unplanned outage — Drax Group plc (DRX.L) — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.