EARLYWIRE · signals before the wire
low

105MW unplanned outage — SP Renewables (UK) Limited

07:26:40 UTC · detected by EARLYWIRE from primary sources

105MW unplanned outage at WHILW-1 — SP Renewables (UK) Limited. Cause: Adjustment To Maximum Generation Levels. Watch GB day-ahead power (N2EX/EPEX). Confidence — occurred 92%, intensity 85%, hits ticker 30%.

105MW unplanned outage — SP Renewables (UK) Limited — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.