EARLYWIRE · signals before the wire
high

585MW unplanned outage — Électricité de France (EDF)

15:15:56 UTC · detected by EARLYWIRE from primary sources

585MW unplanned outage at T_HEYM12 — Électricité de France (EDF). Cause: Operational. Watch GB day-ahead power (N2EX/EPEX). Confidence — occurred 92%, intensity 85%, hits ticker 30%.

585MW unplanned outage — Électricité de France (EDF) — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.