EARLYWIRE · signals before the wire
medium

400MW unplanned outage — Uniper SE (UN0.DE)

19:57:49 UTC · detected by EARLYWIRE from primary sources
$UN0.DE

400MW unplanned outage at CDCL-1 — Uniper SE. Cause: Under investigation. ≈3% of UN0.DE's tracked 14364MW fleet (minor materiality). Watch UN0.DE and GB day-ahead power (N2EX/EPEX). Confidence — occurred 92%, intensity 85%, hits ticker 95%.

400MW unplanned outage — Uniper SE (UN0.DE) — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.