EARLYWIRE · signals before the wire
low

165MW unplanned outage — Unknown operator

05:39:20 UTC · detected by EARLYWIRE from primary sources

165MW unplanned outage at RUHRORT-KW — Unknown operator. Cause: B18. Watch DE-LU day-ahead power (EPEX/EEX). Confidence — occurred 92%, intensity 85%, hits ticker 30%.

165MW unplanned outage — Unknown operator — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.