EARLYWIRE · signals before the wire
low

100MW unplanned outage — Vattenfall AB

15:05:08 UTC · detected by EARLYWIRE from primary sources

100MW unplanned outage at Bastusel — Vattenfall AB. Cause: Failure. Watch SE1 day-ahead power (Nord Pool). Confidence — occurred 92%, intensity 85%, hits ticker 30%.

100MW unplanned outage — Vattenfall AB — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.