EARLYWIRE · signals before the wire
low

160MW unplanned outage — Statkraft AS

09:48:56 UTC · detected by EARLYWIRE from primary sources

160MW unplanned outage at Hylen — Statkraft AS. Cause: Unknown problem with G1. G2 is already out on maintenance.. Watch NO2 day-ahead power (Nord Pool). Confidence — occurred 92%, intensity 85%, hits ticker 30%.

160MW unplanned outage — Statkraft AS — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.