EARLYWIRE · signals before the wire
medium

326MW unplanned outage — EP NI Energy Limited

15:10:20 UTC · detected by EARLYWIRE from primary sources

326MW unplanned outage at GU_504110 (GT6) — EP NI Energy Limited. Cause: Electrical fault. Watch IE day-ahead power (EPEX/EEX). Confidence — occurred 92%, intensity 85%, hits ticker 30%.

326MW unplanned outage — EP NI Energy Limited — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.