EARLYWIRE · signals before the wire
low

119MW unplanned outage — Svenska Cellulosa SCA (SCA-B.ST)

06:33:31 UTC · detected by EARLYWIRE from primary sources
$SCA-B.ST

119MW unplanned outage at SCA Ostrand — Svenska Cellulosa SCA. Cause: Turbine trip.. Watch SCA-B.ST and SE2 day-ahead power (Nord Pool). Confidence — occurred 92%, intensity 85%, hits ticker 82%.

119MW unplanned outage — Svenska Cellulosa SCA (SCA-B.ST) — EARLYWIRE event card VIEW LIVE ON THE DESK → WHAT IS EARLYWIRE?
EARLYWIRE reads primary sources — grid filings, seismic networks, thermal satellites, ship & aircraft transponders — and alerts a median ~19 minutes before the newswire. Live scorecard · informational signals, not investment advice.